The City hired a consultant to perform a condition assessment report of all storm drain culvert crossings in Burlingame. The report identified four culverts to repair, ranked by priority and based on the severity and magnitude of the deteriorating conditions. This was the first phase of a multi-phase project to repair several culvert crossings identified in the report.
Scope: Project work would included repairing storm drain culvert crossings, construction of new storm drain inlets, storm drain mains, curbs and gutters, curb ramp, and facilities in public right of ways,.